Tower Crane Manufacture 8 tons 1.5ton Tip Load 5015 Construction Tower Crane Factory
Company information for HYCM-TOWER CRANES
1. A professional manufacturer and exporter of tower crane & construction hoist & derrick crane & suspended platform since 2002;
2. Preferential ex-factory price, excellent product quality and good after-sales service are our pursuit;
3. Our products had been exported to more than 30 countries, such as Korea, Mexico, Vietnam, Philippines, Indonesia, India, Sri Lanka, Cambodia, Russia, Kazakhstan, Brazil, Cyprus, Belgium and Algeria etc.
Specifications for Tower Crane Manufacture 8 tons 1.5ton Tip Load 5015 Construction Tower Crane Factory
Main Performance |
Main Specifications |
Rated lifting moment (KN.m) |
800 |
Max. lifting load(t) |
8 |
Tip load(t) |
1.5 |
Working range(m) |
50 |
Lifting height(m) |
Freestanding height |
45 |
Attaching height |
150 |
Mast section |
Main limb (mm) |
Square tube 135*12/ Q345B |
Section size(mm) |
1835*1835*2500 |
Lifting jib |
Upper chord(mm) |
Ø89X8 / 20# |
Lower chord(mm) |
∠90X8 two angle steel / Q345B |
Counter jib |
Main limb(mm) |
[32b/ Q235B |
Length(m) |
12.636 |
Hoisting mechanism |
Reducer |
30TQ20 |
Motor |
YZRD225-4/8-30/30KW |
Brake |
YWZ-315/45 |
Wire rope |
6X37-16-1770-1-1right lay |
Hoisting speed (m/min) |
80/40 40/20 |
Slewing mechanism |
Reducer |
XX100,195 |
Motor |
YZR132-6-3.7KW |
Coupler |
YOX280A |
Slewing speed (r/min) |
0.6 |
Trolleying mechanism |
Reducer |
XX120 |
Motor |
YD132S-4/8-3.3/2.2KW |
Trolleying speed( m/min) |
40/20 |
Jacking-up speed |
Hydraulic pump station
Jacking oil cylinder
|
TQZ80/160/125 |
Motor |
Y132M-4-5.5 |
Slewing bearing |
Type |
1250.45 |
Description for Tower Crane Manufacture 8 tons 1.5ton Tip Load 5015 Construction Tower Crane Factory
1. The Fixed Tower crane base fixed to the ground on a concrete foundation
2. The base is then attached to the mast sections which gives the crane its height.
3. Further the mast is attached to the slewing unit that allows the crane to slewing.
4. The horizontal jib (working arm) is the part of the crane that carries the load.
5. The counter-jib carries a counterweight while the jib suspends the load to and from the center of the crane.
6. The crane operator usually stay in the cabin at the top of the tower.
7. The lifting hook is operated by the operator using electric motors to manipulate wire rope cables through a system of sheaves which lift the building materials
Safety Devices for Tower Crane Manufacture 8 tons 1.5ton Tip Load 5015 Construction Tower Crane Factory
1) Wind lock device
2) Over load limit
3) Hoist height limit
4) Over speed limit
5) Slewing angle limit
6) Lifting moment limit
7) Emergency stop button
8) Obstruction light (tip of jib / tower head)
Photos for Tower Crane Manufacture 8 tons 1.5ton Tip Load 5015 Construction Tower Crane Factory